Hi Friends,

Even as I launch this today ( my 80th Birthday ), I realize that there is yet so much to say and do. There is just no time to look back, no time to wonder,"Will anyone read these pages?"

With regards,
Hemen Parekh
27 June 2013

Now as I approach my 90th birthday ( 27 June 2023 ) , I invite you to visit my Digital Avatar ( www.hemenparekh.ai ) – and continue chatting with me , even when I am no more here physically

Tuesday 15 February 2022

ELON , You have missed the Bus / by 5 YEARS

 


Phased Manufacturing Programme (PMP)

( source : https://e-amrit.niti.gov.in/national-level-policy )

To boost electric mobility and promote development of electric vehicles, a phased manufacturing roadmap has been developed, taking into account the current state of the manufacturing ecosystem in the country, in which indigenous manufacturing of electric vehicles, their assemblies/sub-assemblies, and parts/sub-parts/inputs of the sub-assemblies will be promoted over time through a graded duty structure. The goal is to significantly boost value addition and capacity building in the country.

The following Phased Manufacturing Programme (PMP) is notified:

 

 

Current BCD w.e.f. 30/01/2019

Phased Manufacturine proposal

S.No.

Item Description

Current BCD w.e.f. 30/01/2019

Phased Manufacturine proposal

Proposed BCD

Proposed Date of PMP

1

CBU

Bus (HS 8702) & Trucks (HS 8704)

25%

50%

April 2020 onwards

2

SKD

PV(HS 8703) & 3W (HS 8703/8704)

15%

30%

2W(HS 8711)

25%

Bus(HS 8702)

25%

Truck(HS 8702)

25%

3

CKD

Bus(HS 8704)

10%

15%

PV (HS 8703) 2W (HS 8711) 3W(HS 8703/8704)& Truck (HS 8704)

4

Lithlum lon cells (HS 85076000) for use in the manufacture of Lithium ion accumulator for electric vehicles

5%

15%

April 2021 onwards

5

Battery packs (HS 8507) for use in the manufacture of electric vehicleS

5%

15%

6.

Parts for use in the manufacture of electric vehicles like

  • AC or DC Charger
  • AC or DC Motor
  • AC or DC Motor Controller
  • Power Control Unit (Inverter, AC/DC Converter, Condenser)
  • Energy Monitor
  • Contactor
  • Brake System for recovering
  • Electric Compressor

0%

15%

April 2021 onwards

 

MY TAKE :

 

Will Tesla follow Apple ?............................ [ 23 May 2017 ]

 

Extract :


Dear Elon :

 For immediate approval ( in 24 hours ) , pl submit your PMP as follows :

 

2017-18  :

Set up factory next to Mundra Port ( Gujarat ) to facilitate world-wide exports

  

2018-19  :

Source locally , Tyres / Chasis / Body / Electricals  / Windows / Dashboards ..etc

 

2019-20   :

Manufacture in your own factory , Li-ion Battery  / Wall-mounted Powerpack Storages / Solar Roof Tiles

 

2020-21  :

Manufacture  RFID Sensors - Cameras – GPS locators

 

2021-22   :

Augmented Reality  Devices  /  Autonomous Navigation Devices ( Radar – Lidar  )

 

 

Now , it is very possible that neither Shri Gadkariji , nor Shri Goyalji , would be satisfied with such a slow PMP , spread out over a period of 5 years

  

They may , well request  Elon to cut it down to 3 years

 

 

Reducing custom duty ( from current 110 % to 40 % - as requested by TESLA and some other foreign manufacturers , would not make any dent in India’s Electric car market, as can be seen from :

 

To beat OR not to beat ?........................... [ 29 Dec 2020 ]


 At the most , those imported cars ( selling for Rs 40 lakh + , even with 40 % duty ), could have sold 3,000 numbers out of Indian market of 3 MILLION  !

That is not the point

Point is simple :

Ø  TESLA must come to India with a firm commitment for Local Manufacture

Ø  There was nothing difficult for TESLA to accept the Phased Manufacturing Program suggested by me above, some 5 YEARS back

Ø  The PMP announced by GOI, last week ( shown above ) is almost IDENTICAL to my 2017 proposal

 

With regards,

Hemen parekh  /  hcp@RecruitGuru.com /  16 Feb 2022

 

 

No comments:

Post a Comment