Phased Manufacturing Programme (PMP)
( source : https://e-amrit.niti.gov.in/national-level-policy
)
To boost electric mobility and
promote development of electric vehicles, a phased manufacturing roadmap has
been developed, taking into account the current state of the manufacturing
ecosystem in the country, in which indigenous manufacturing of electric vehicles,
their assemblies/sub-assemblies, and parts/sub-parts/inputs of the
sub-assemblies will be promoted over time through a graded duty structure. The
goal is to significantly boost value addition and capacity building in the
country.
The following Phased
Manufacturing Programme (PMP) is notified:
|
|
Current BCD w.e.f. 30/01/2019 |
Phased Manufacturine proposal |
|||||||
S.No. |
Item Description |
Current BCD w.e.f. 30/01/2019 |
Phased Manufacturine proposal |
|||||||
Proposed BCD |
Proposed Date of PMP |
|||||||||
1 |
CBU |
Bus (HS 8702) & Trucks (HS 8704) |
25% |
50% |
April 2020 onwards |
|||||
2 |
SKD |
PV(HS 8703) & 3W (HS 8703/8704) |
15% |
30% |
||||||
2W(HS 8711) |
25% |
|||||||||
Bus(HS 8702) |
25% |
|||||||||
Truck(HS 8702) |
25% |
|||||||||
3 |
CKD |
Bus(HS 8704) |
10% |
15% |
||||||
PV (HS 8703) 2W (HS 8711) 3W(HS
8703/8704)& Truck (HS 8704) |
||||||||||
4 |
Lithlum lon cells (HS 85076000) for
use in the manufacture of Lithium ion accumulator for electric vehicles |
5% |
15% |
April 2021 onwards |
||||||
5 |
Battery packs (HS 8507) for use in
the manufacture of electric vehicleS |
5% |
15% |
|||||||
6. |
Parts for use in the manufacture of electric vehicles like
|
0% |
15% |
April 2021 onwards |
||||||
MY
TAKE
:
Will
Tesla follow Apple ?............................ [ 23 May 2017 ]
Extract :
Dear Elon :
For immediate approval ( in 24 hours ) , pl submit your PMP as follows :
2017-18 :
Set up factory next to Mundra Port ( Gujarat ) to facilitate
world-wide exports
2018-19 :
Source locally , Tyres / Chasis /
Body / Electricals / Windows / Dashboards ..etc
2019-20 :
Manufacture in your own factory ,
Li-ion Battery / Wall-mounted Powerpack Storages /
2020-21 :
Manufacture RFID Sensors - Cameras – GPS locators
2021-22 :
Augmented Reality Devices
/ Autonomous Navigation Devices ( Radar – Lidar )
Now , it is very possible that
neither Shri Gadkariji ,
nor Shri Goyalji , would be
satisfied with such a slow PMP , spread out over a period of 5 years
They may , well request Elon to
cut it down to 3 years
Reducing custom duty ( from current 110
% to 40 % - as requested by TESLA and some other foreign manufacturers , would
not make any dent in India’s Electric car market, as can be seen from :
To
beat OR not to beat ?........................... [ 29 Dec 2020 ]
At the most , those imported cars ( selling for Rs 40 lakh
+ , even with 40 % duty ), could have sold 3,000 numbers out of Indian market
of 3 MILLION !
That is not the point
Point is simple :
Ø
TESLA must come to India with a firm commitment for Local
Manufacture
Ø
There was nothing difficult for TESLA to accept the Phased
Manufacturing Program suggested by me above, some 5 YEARS back
Ø
The PMP announced by GOI, last week ( shown above ) is almost
IDENTICAL to my 2017 proposal
With regards,
Hemen parekh / hcp@RecruitGuru.com
/ 16 Feb 2022